top of page
Shielding steel elements bearing

Design and implementation of fire protection for a load-bearing steel frame

A complete engineering envelope for protecting steel constructions from fire, from the structural inspection and design phase to execution, quality control and obtaining the required permits

For professional advice
Shielding steel elements bearing
Shielding steel elements bearing

20 years of experience in fire protection of steel

Planning and execution through professional teams

Compliance with project, standard and fire safety requirements

Shielding steel elements bearing

Why is fire protection required for a steel frame?

Steel is a strong and durable material, but when exposed to high temperatures it gradually loses its load-bearing capacity. During a fire, rapid heating of the frame elements may compromise the stability of the construction.

A designed fire protection system slows down the heating of the steel, helps maintain the stability of the structure and allows it to withstand the fire resistance time specified for the project.

Maintaining the stability of the construction

Slowing down the heating of the steel elements and maintaining the load-bearing capacity for the required time

Reducing the risk of collapse

Reducing the risk of rapid loss of skeletal strength during a fire

Allowing time for evacuation and rescue operations

Assisting in maintaining the building during the evacuation of residents and handling the incident

Meeting project requirements

Adapting the protection system to the design requirements, standards and approving authorities

From the planning stage to receiving approval

1

Checking the structure and requirements

Examination of the construction plans, steel elements and required fire resistance time

2

Adapting the shielding method

Choosing a system that is appropriate for the profiles, project conditions, and finishing requirements

3

Preparation of specifications and implementation details

Defining the system, the thicknesses and the required connection details

4

Carrying out the protection work

Implementation of the system through professional teams and in accordance with the approved details

5

Quality control and support

Checking surface preparation, protection thickness, continuity, and treatment of complex points.

6

Inspection and approval

Ordering a certified laboratory and preparing the documents to continue the approval process

How is the protection method chosen?

How is the protection method chosen?

There is no single protection method that is suitable for every structure and every element. The choice is made after examining the types of profiles, the required fire resistance time, the construction requirements, the finishing requirements and the execution conditions on site

Engineering support and quality control

Engineering support and quality control

The quality of the shielding system depends on the detailed design, surface preparation, shielding thickness, system continuity, and application quality. After the work is completed, an external, certified laboratory is invited to test the shielding. The test documents are submitted as part of the approval process with the relevant authorities.

Common methods for protecting steel from fire

Color swells in heat

Color swells in heat

A dedicated paint system that swells when exposed to heat and creates an insulating layer around the steel element.

Dedicated shielding panels

Dedicated shielding panels

Wrapping the beam or column with fire-resistant panels that create an insulated envelope.

Sprayed cementitious material

Sprayed cementitious material

Applying a layer of insulating material to the steel in a thickness appropriate for the required durability time.

Our Specialties

20 years of professional experience

Experience in designing and implementing fire protection for steel structures.

Constructive vision

Examining the skeleton, loads, protection details, and execution conditions as a single system.

One professional address

Support from the requirements review stage to implementation, testing and approval

Exact match to the project

Choosing a method according to the elements, finish, standards and site conditions.

Weizmann Institute of Science

elal

Tidhar Gamarim

Alum eshet

Building College

Elbit Systems

Additional projects
Oren Avshalom
Director of Safety and Hygiene Engineering Department

I would like to thank you for your cooperation and professional assistance over the years in the various projects you have carried out at Clalit institutions, as well as in the ad hoc consulting and professional lectures you have given to various professional forums at Clalit.

Your professional knowledge and experience are evident and have contributed greatly to the advancement of the field of fire safety.

לוגו אורטק.png
Collaboration in the field of flame retardant testing at the Standards Institute of Israel

I would like to personally thank you for the fruitful and professional cooperation during the inspection at the Standards Institute of Israel that we were required to perform by the various authorities. The cooperation was between our company's installation team and the Standards Institute personnel, which you successfully managed.

לוגו אורטק.png
Unique engineering solutions in the field of passive fire protection

Our company performed the engineering design and execution management for upgrading the fire resistance of the load-bearing concrete elements in the lower half of the "Davidoff Cancer Center" building at Beilinson Hospital.

We were very impressed by the fruitful collaboration, the precise and sensitive management that combined exceptionally high engineering capabilities.

לוגו אורטק.png
Smoke and fire curtains

Guy's engineering and technical expertise and excellent management experience has been essential in driving forward our business and increasing sales of our range of smoke and fire curtains in Israel.

לוגו אורטק.png
Cooperation in the field of protecting load-bearing steel structures

I would like to personally thank you for the fruitful and professional cooperation, which included providing a professional and creative solution to protecting complicated elements under complex access conditions, across hundreds of tons of steel.


לוגו אורטק.png

Frequently Asked Questions

The shielding slows down the heating of the steel and helps maintain the load-bearing capacity of the skeleton for the durability period determined in the design.

The shielding slows down the heating of the steel and helps maintain the load-bearing capacity of the skeleton for the durability period determined in the design.

The method is selected according to the types of profiles, durability time, finishing requirements, site conditions, and the system that can be approved for the project.

The method is selected according to the types of profiles, durability time, finishing requirements, site conditions, and the system that can be approved for the project.

The methods presented on the page are heat-infusing paint, wrapping with special panels, and sprayed cementitious material.

The methods presented on the page are heat-infusing paint, wrapping with special panels, and sprayed cementitious material.

Yes. The proposed service structure includes planning, preparation of details, supervision of the protection work, quality control, and support in the inspection and approval process.

Yes. The proposed service structure includes planning, preparation of details, supervision of the protection work, quality control, and support in the inspection and approval process.

Design protection using an insulated cementitious system - T.I. 1733

Will be carried out in accordance with the guidelines of the 1733 Law

Box-shaped packaging made of special fire-resistant panels - EN 13381

Will be designed according to European standard EN 13381

Or in accordance with the British ASFP guidelines found in the "Yellow Book"

or the American standard UL 263

Dedicated color system - EN 13381

There is no Israeli standard, it is common to use the European standard EN 13381.

Or in accordance with the British ASFP guidelines found in the "Yellow Book"

or the American standard UL 263

Add a Title

Additional areas of expertise

Concrete element protection
Concrete element protection
Building compartmentalization
Building compartmentalization
Curtain walls
Curtain walls
Fire barriers
Fire barriers
Flame retardants
Flame retardants
Review and maintenance of existing buildings
Review and maintenance of existing buildings
Consulting and engineering solutions
Consulting and engineering solutions
Energy storage and transformer rooms
Energy storage and transformer rooms
Fire barriers in data centers
Fire barriers in data centers

Among our clients

bottom of page