top of page
Review and maintenance of existing buildings

Review and maintenance of fire barriers in existing buildings

Early detection of failures, preventive maintenance, documentation and monitoring to maintain the safety of the structure over time.

For professional advice
Review and maintenance of existing buildings
Review and maintenance of existing buildings

Early detection of failures

Documented report with recommendations for correction

Monitoring and control after repairs

Review and maintenance of existing buildings

Why is it important to check fire barriers in existing buildings?

Fire barriers are designed to compartmentalize the building and limit the spread of fire and smoke in the event of a fire. In existing buildings, they may be damaged during the installation of other systems, due to poor maintenance or due to wear and tear over time.

Damage to the barriers may allow fire and smoke to pass between the various fire compartments in the building. Periodic surveys allow for early detection of failures, preventive maintenance, and the safety of occupants, property, and the building.

Early detection of failures

Detecting defects before they become a widespread risk in the structure

Preventive maintenance

Planning an orderly treatment of defects and damaged points

Documentation for decision-making

A report that allows you to prioritize repairs and track performance

Maintaining compartmentalization function over time

Re-inspection after repairs and planning periodic surveys

The survey and monitoring process

1

Planning and preparation

Collect existing plans, maintenance history, and reports

2

Visual inspection

Scanning the compartmentalized areas and fire barriers throughout the building

3

Technical tests as needed

Detecting hidden failures and checking system materials and connections

4

Documentation and summary report

Collection of images, locations, severity of defects and recommendations

5

Monitoring and control

Re-inspection after repairs and planning for continued maintenance

Planning and preparing the survey

Planning and preparing the survey

The survey begins by gathering information about the building, including construction plans, maintenance history, and previous reports of failures. Then, coordination is made with the building managers and tenants to set a suitable date and conduct a comprehensive inspection.

Documentation, correction and control

Documentation, correction and control

All findings are documented in detail, including photos and notes. At the end of the survey, a summary report is produced with recommendations for correction and improvement. After the corrections are made, a re-inspection can be performed to ensure that the failures have been properly addressed.

The stages of the survey in the structure

בדיקה ויזואלית מקיפה

בדיקה ויזואלית מקיפה

סריקה של קירות, תקרות, רצפות, חדירות ותפרים לאיתור נזק, פתחים לא אטומים ותיקונים לא תקינים.

בדיקות טכניות לפי הצורך

בדיקות טכניות לפי הצורך

שימוש באמצעי בדיקה ומדידה לאיתור כשלים שאינם גלויים לעין ולבחינת רציפות ההפרדות.

בדיקת חדירות מערכות

בדיקת חדירות מערכות

בדיקת רציפות האיטום סביב צנרת, כבלים, סולמות ומגשי שירות העוברים דרך קירות ותקרות הפרדה.

בדיקת התאמה ותקינות

בדיקת התאמה ותקינות

זיהוי חומרים, תיקונים ופתרונות שאינם תואמים לדרישות, ובדיקת שמירת דירוג העמידות באש.

תיעוד ודיווח

תיעוד ודיווח

צילום הממצאים, רישום מיקום הליקויים והכנת דוח מסודר עם המלצות לתיקון ולמעקב.

Our Specialties

Systematic examination of compartmentalization

Orderly passage through areas, openings and barriers.

Clear documentation of findings

Concentration of defects and engineering recommendations for decision-making.

Full management of the upgrade

Accompanying the transition from the survey phase to correcting the existing situation

Post-repair follow-up

Possibility to check completeness and plan periodic surveys

Habima

Elbit Systems

Tidhar Gamarim

Aluminum Construction

Building College

Ashdod Stadium

Additional projects
Unique engineering solutions in the field of passive fire protection

Our company performed the engineering design and execution management for upgrading the fire resistance of the load-bearing concrete elements in the lower half of the "Davidoff Cancer Center" building at Beilinson Hospital.

We were very impressed by the fruitful collaboration, the precise and sensitive management that combined exceptionally high engineering capabilities.

לוגו אורטק.png
Smoke and fire curtains

Guy's engineering and technical expertise and excellent management experience has been essential in driving forward our business and increasing sales of our range of smoke and fire curtains in Israel.

לוגו אורטק.png
Collaboration in the field of flame retardant testing at the Standards Institute of Israel

I would like to personally thank you for the fruitful and professional cooperation during the inspection at the Standards Institute of Israel that we were required to perform by the various authorities. The cooperation was between our company's installation team and the Standards Institute personnel, which you successfully managed.

לוגו אורטק.png
Cooperation in the field of protecting load-bearing steel structures

I would like to personally thank you for the fruitful and professional cooperation, which included providing a professional and creative solution to protecting complicated elements under complex access conditions, across hundreds of tons of steel.


לוגו אורטק.png
Oren Avshalom
Director of Safety and Hygiene Engineering Department

I would like to thank you for your cooperation and professional assistance over the years in the various projects you have carried out at Clalit institutions, as well as in the ad hoc consulting and professional lectures you have given to various professional forums at Clalit.

Your professional knowledge and experience are evident and have contributed greatly to the advancement of the field of fire safety.

לוגו אורטק.png

Frequently Asked Questions

Work on systems, changes, wear and tear, and inappropriate repairs may impair their continuity.

Fire barriers and penetrations of cables, pipes and service trays through walls and separation ceilings are tested.

Damage to a fire barrier may allow the passage of fire, smoke, and hot gases and damage the equipment, infrastructure, and functional continuity of the facility.

Information collection, visual inspection, additional tests as needed, documentation and recommendation report.

A report detailing the findings, their location, severity, and recommendations for correction and follow-up.

The survey includes identifying defects, documenting findings, and preparing engineering recommendations for upgrading.

A re-inspection makes it possible to verify that the defects have been addressed and that the compartmentation system has been restored to a normal state.

Yes. According to the attached material, the upgrade can be managed through qualified and expert subcontractors.

The attached material indicates transport for compliance with Israeli Standard 2174.

TBD -

Add a Title

Additional areas of expertise

Steel element shielding
Steel element shielding
Concrete element protection
Concrete element protection
Building compartmentalization
Building compartmentalization
Curtain walls
Curtain walls
Fire barriers
Fire barriers
Flame retardants
Flame retardants
Consulting and engineering solutions
Consulting and engineering solutions
Energy storage and transformer rooms
Energy storage and transformer rooms
Fire barriers in data centers
Fire barriers in data centers

Among our clients

bottom of page