Over 20 years of experience in passive fire protection for curtain walls
Compliance with existing planning and standard requirements
Support from planning and installation to laboratory approval and Form 4

Why is it important to take care of sealing the seam strip already at the planning stage?
At the junction between the curtain wall and the concrete ceiling, a continuous engineering solution is required to reduce the passage of fire, flames, and smoke between floors. When a request is received from a fire safety consultant, an aluminum consultant, or a certified laboratory to regulate the fire barrier, it is important to incorporate the solution already in the design and not wait until the execution phase.
Early planning allows for examining the existing detail, adapting an appropriate solution, and incorporating it into the plans and execution interfaces.
Preventing passage between floors
Sealing the perimeter seam between the ceiling and the curtain wall
Maintaining the continuity of the fire department
Connection between the facade system and the ceiling edge as part of the compartmentalization envelope
Adaptation to system movements
Choosing a detail that is appropriate for the facade structure and expected movements
Control over sensitive information
Design and inspection of a repeat point along the perimeter of the building
Support from the individual examination stage to approval
1
Examining the details of the facade
Checking the curtain wall system, ceiling edge and seam width
2
Defining protection requirements
Examining durability time, movements, and exposure conditions
3
Solution adaptation
Choosing a solution that is appropriate for the existing design and execution conditions
4
Preparation of execution details
Defining the filling, sealing and connection layers
5
Installation and continuity control
Checking the continuity of the barrier along the perimeter of the floor
6
Final approval
Completion of the documents required for laboratory approval and Form 4